Customization: | Available |
---|---|
After-sales Service: | Video or Technical Support |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 5880/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction of Concrete Machinery Portable Mobile Diesel Electric Trailer Mounted Mini Concrete Conveying Pumping Machine Cement Transfer Pump
After the concrete is pumped, the conveying pipeline should be cleaned immediately, the pump machine should be cleaned, inspection and maintenance and other finishing work should be carried out. (1) Cleaning of conveying pipelines Air washing steps of conveying pipelines a. The pipeline should be equipped with a stop valve, and the stop plate should be inserted to prevent the concrete in the vertical or upward inclined pipe from flowing backward. b. Take out some of the concrete at the mouth of the first straight pipe and connect it to the air wash joint. The joint should be filled with a sponge ball soaked in water in advance, and the inlet and exhaust valves and compressed air hoses should be installed on the joint. c. Install a safety cover at the end of the pipe to prevent concrete injection from hurting people. d. Slowly open the compressed air intake valve, so that the compressed air presses out the sponge ball and concrete. If the pipeline is equipped with a stop valve, it should be in the open position first, and then open the air valve. e. When the concrete in the pipeline has been completely emptied, and the sponge ball has been shot out, the air washing is completed. At this time, the compressed air intake valve should be closed, and then various pipe fittings should be removed.
zmwm21
Parameters of Concrete Machinery Portable Mobile Diesel Electric Trailer Mounted Mini Concrete Conveying Pumping Machine Cement Transfer Pump
Project | Unit | HBTS25 | HBTS40 | HBTS60 | HBTS80 |
Maximum theoretical delivery | m³/h | 23 | 40 | 60 | 80 |
Maximum outlet pressure | Mpa | 8 | 13 | 13 | 13-16 |
Maximum theoretical transport distance | m | 100/300 | 200/800 | 240/1100 | 240/1100 |
Motor Power | kw | 30 | 55 | 90 | 90-110 |
Feeding height | mm | 1200 | 1200 | 1350 | 1350 |
Pumpable concrete maximum particle size | mm | ≤50 | ≤40 | ≤40 | ≤40 |
Most suitable for pumping concrete slump | cm | 15-23 | 15-23 | 15-23 | 15-23 |
Duct inner diameter | mm | Φ125 | Φ125 | Φ125 | Φ125 |
Host weight | Kg | 1900 | 3400 | 5000 | 5600 |
Dimensions: length × width × height | mm | 3300×1600 ×1800 |
4300×1600 ×1800 |
5500×1800 ×2000 |
5800×1800 ×2000 |
Photos of Concrete Machinery Portable Mobile Diesel Electric Trailer Mounted Mini Concrete Conveying Pumping Machine Cement Transfer Pump